Serving Glasgow & Central ScotlandMon–Sat · 7:30am – 6pm
Free home visit & written quote07777 780557info@refurbishmentanddecoration.com
07777 780557 Free Quote
Painting portfolio placeholder — Exterior
Home  /  Services  /  Exterior Painting

Exterior Painting

Exterior painting in Glasgow: harling, dry dash, render and woodwork, prepared and coated for west of Scotland weather. Free survey and a fixed written quote.

Overview

Built for Scottish
weather.

Glasgow’s houses are finished in harling, dry dash, render and sandstone, under some of the wettest skies in the UK. Each needs a different approach, and some surfaces should not be painted at all. We survey the walls, repair what needs repairing, and agree the products and the schedule in your written quote.

Harling, dry dash and render

Most 20th-century semis, bungalows and four-in-a-blocks around Glasgow are finished in cement harl, dry dash (pebbledash) or render. Sound, previously painted cement finishes take a good-quality masonry paint well. Dry dash is painted by roller and brush so every face of the stones is covered, never sprayed alone. Hollow or cracked render is cut out and repaired first, because paint over it traps water and fails within a winter or two.

Sandstone and older lime finishes

Unpainted sandstone should be left unpainted. Trapped water carries salts into the stone and freezes in it, and paint only hides the damage until the face flakes away. Where stone has already been painted, we check its condition and repaint with a vapour-permeable system, or recommend advice on removal if the paint is failing badly. Lime harl on older stone buildings needs a breathable finish such as limewash or a mineral paint. On a listed building or in a conservation area, colour changes and stone painting may need permission from Glasgow City Council, so we check before quoting.

When we paint

Masonry paint needs a dry wall, a dry forecast and enough warmth to cure. A typical product should not be applied below 7 °C, in rain or fog, or above 80% humidity. In Glasgow that means roughly May to September, starting after the dew has dried and allowing a dry day or two after wet weather. Our quotes allow for rain days, and summer books up early.

How the job runs

Survey, repairs, a fungicidal wash for algae and mould, loose paint scraped and powdery surfaces stabilised, then two full coats one elevation at a time, with fascias, soffits, sills and doors usually last. Leaking gutters, cracked sills and splashback at the foot of the wall are where most paint failures start, so we point them out first.

What it costs

Exterior work costs more than interior because of access, weather and preparation, and textured finishes take far longer and more paint than smooth render. Our guide to painting harling, render and sandstone in Glasgow sets out published exterior prices and a worked example for a harled semi. Every quote is fixed and written after a free survey. For published Glasgow prices see our painting and decorating prices guide; for tenement properties, our tenement guide.

Areas we cover

We offer exterior painting across Glasgow and Central Scotland. Each area page has local notes and answers to common questions:

  • Glasgow: the whole city, from tenement flats in the West End and Southside to houses across the East End and the north.
  • Paisley: the town and nearby Renfrew, Johnstone and Linwood.
  • East Kilbride: the whole town across G74 and G75.
  • Hamilton: with Blantyre, Bothwell and Larkhall.
  • Motherwell: with Wishaw and Bellshill.
  • Clydebank: with Duntocher, Faifley and Old Kilpatrick.
  • Milngavie: with Bearsden and Strathblane.

What's included

Survey firstRender tapped for hollow patches; cracks, gutters and sills checked.
RepairsHollow or cracked render patched and left to cure before painting.
Fungicidal washAlgae and mould treated, washed down and left to dry.
The right paint for the wallMasonry paint on cement; breathable finishes on lime and stone.
Two full coatsRolled and brushed into every face of harl and dry dash.
WoodworkFascias, soffits, sills, frames and doors prepared and painted.
ProtectionPaths, plants, windows and neighbours' property covered.
Final walk-roundA detailed check with you and a complete clean-up.

Typical investment

Guide prices for Central Scotland homes, including premium paint and labour. Your written quote is fixed.

Small projectAsk usWritten estimate
Full propertyAsk usMeasured on site
Custom scopeAsk usFixed written quote

Recent projects

Corridor finished in white, walls and ceilingWhite walls with grey and white banister paintwork.Doorway and living room after the repaint
FAQ

Exterior Painting
questions.

When is the best time to paint outside in Glasgow?

Roughly May to September. Masonry paint typically needs at least 7 °C, no rain or fog, and humidity below 80% while it dries, and a harled wall needs a dry day or two after wet weather. April and October are possible in a settled spell. Book early for June and July.

Can you paint harling and pebbledash?

Yes, it is most of our exterior work. Previously painted cement harl and dry dash take a good masonry paint well. We repair hollow or cracked render first and apply two coats by roller and brush, so the undersides of the stones are covered.

Should I paint my sandstone?

Generally no. The Dennistoun conservation area advice, prepared with Glasgow City Council, says natural stonework should not be painted, and paint traps water that damages the stone. If your stone is already painted, we check it and repaint with a vapour-permeable system, or advise on getting specialist help if it is failing.

Do I need permission to paint the outside of my house?

Repainting in the same colour on an ordinary house outside a conservation area does not normally need permission. Changing colours on a listed building, or painting stone in a conservation area such as Dennistoun or the West End, may. In a tenement, the other owners and your title deeds also matter. Check with Glasgow City Council first.

How long does exterior painting take?

Published figures give 3–4 working days for a smooth-rendered semi and 6–7 days for a textured one, plus rain days. A short job can stretch over two weeks of calendar time in a broken summer, which is why our quotes allow for weather.

Why does pebbledash cost more to paint than smooth render?

It takes longer and uses far more paint. A typical masonry paint covers up to 16 m² per litre on smooth render but only 4–6 m² on pebbledash, and every stone has to be covered from several angles.

How do you price exterior work?

We survey the house and give a fixed written quote covering repairs, preparation, the paint system, the number of coats, access and woodwork, so you know what is and is not included.

Will you tell me if paint is the wrong answer?

Yes. If render is hollow, a gutter is leaking or a wall is damp, we say so before painting, because paint will not fix the cause and will fail early over it.

Which areas do you cover for exterior painting?

We paint the outside of homes across Glasgow and Central Scotland, including Glasgow, Paisley, East Kilbride, Hamilton, Motherwell, Clydebank and Milngavie, and the towns around them. Exterior work is booked for the drier months, so ask early in the year. Send your postcode with your quote request and we will confirm.

Call nowFree quote